Rose Way Industrial Park

INDUSTRIAL PARK, BUILDINGS

The Rose Way Industrial Park will be the fifth site for the Port. It will include, at its full build-out, six buildings ranging from 15,000-25,000 square feet for industrial and manufacturing purposes. The Port will break ground on phase one of the construction with the site infrastructure and road way in June 2021 and completing before the end of 2021. The Port will be designing two of the six buildings for construction in 2021. The Port estimates that building E and F, a 23,000 sq. foot and a 15,000 sf. building will be constructed in 2022. The Port is currently accepting letters of interest from businesses looking for leased manufacturing and industrial space.  Those interest should complete the Letter of Interest form LETTER OF INTEREST. 

Property Photos

Aerial Video

Bids / RFPs / RFQs

Bid Results / Contract Awards